Quality and Reliability Engineering International

A Comparative Study of Joint Monitoring Schemes for APC Processes

Journal Article

Abstract

To monitor processes under automatic process control (APC), several joint monitoring schemes have recently been proposed, such as the U statistics, equation image and equation image, that originate from the uniformly most powerful test. It is known that the equation image chart is sensitive to large shift detection whereas the equation image chart is sensitive to small shift detection. To take advantage of both charts, this paper examines a combined use of the two U charts. A comparative study indicates that the combined procedure improves over a single U chart and performs better than other joint monitoring schemes, including Hotelling's equation image chart for APC processes. Copyright © 2006 John Wiley & Sons, Ltd.

Related Topics

Related Publications

Related Content

Site Footer

Address:

This website is provided by John Wiley & Sons Limited, The Atrium, Southern Gate, Chichester, West Sussex PO19 8SQ (Company No: 00641132, VAT No: 376766987)

Published features on StatisticsViews.com are checked for statistical accuracy by a panel from the European Network for Business and Industrial Statistics (ENBIS)   to whom Wiley and StatisticsViews.com express their gratitude. This panel are: Ron Kenett, David Steinberg, Shirley Coleman, Irena Ograjenšek, Fabrizio Ruggeri, Rainer Göb, Philippe Castagliola, Xavier Tort-Martorell, Bart De Ketelaere, Antonio Pievatolo, Martina Vandebroek, Lance Mitchell, Gilbert Saporta, Helmut Waldl and Stelios Psarakis.